Muscatine High School
Muscatine, Iowa
Services
Audio/Visual
Electrical Construction
Structured Cabling
Markets
The Muscatine Community School District’s 22,000 sq. ft. expansion to the high school consisted of Physics labs, Chemistry labs, a STEM lab, and General Science labs. The interior electrical system consisted of both emergency and normal power systems. An addressable fire alarm system, along with Linear LED lighting and integrated lighting controls were also installed throughout. A paging system was installed within the new addition along with State of the Art Multi-Media Learning Stairs and collaboration classrooms. Tri-City Electric Co. worked closely with the owners and the construction team to provide a project schedule defining the design, procurement, and construction of the project, along with a detailed execution plan.